Rear Panel
Figure 2-11
Rear panel
1E, 2X,
3X, and 4E
Slots for installing switch
modules and pass-through
modules. It is recommended
that pass-through modules be
installed in slots 1E and 4E to
facilitate cable routing.
MM1 and
MM2
Slots for installing
management modules.
PSU 1 to
PSU 6
Slots for installing PSUs.
(1) to (14)
Slots for installing fan
modules.
ESD jack
A jack for inserting the ESD
wrist strap.
PGND
Ground terminal.
2.5 Power Supply System
This section describes the principles of the E9000 chassis power supply system, AC PSU, DC
PSU, and the PSU configuration policies.
E9000 Server
User Guide
2 Overview
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
15