NO TICE
Take a compute node out of its ESD bag only before you install it immediately.
Figure 3-36
Proper operations
Figure 3-37
Improper operations
Step 2
Determine the slot for installing the full-width compute node.
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
73