No.
Material
Quantity
6
Guide rail
2 (optional)
7
Floating nut hook
1
8
Network cable
Depending on the contract
9
Power cable
Same as the number of PSUs
10
Product documentation bag
NOTE
The product documentation bag
contains a copy of
Huawei Server
Warranty
, an E9000 chassis
installation template, and a copy of
the
E9000 Server Quick Start Guide
.
1
----End
3.3 Removing Components
This section describes how to remove fan modules, PSUs, management modules, switch
modules, and pass-through modules from the E9000 chassis before installing the chassis.
Scenarios
If no chassis moving tool (such as an elevating ladder) is available, remove the fan modules,
PSUs, management modules, switch modules, and pass-through modules from the E9000
chassis before installing the chassis. Place the removed modules in ESD bags or on an ESD
floor without stacking them. When all these modules are installed in the E9000 chassis, the
total weight is around 100 kg (220.5 lb), which exceeds the allowed maximum weight (68 kg
or 149.94 lb) carried by four persons.
If a chassis moving tool is available, move the chassis without removing the components.
However, you must remove the components before installing the chassis.
The allowed maximum weight must comply with local laws and regulations.
Workflow
Users do not need to strictly follow the workflow.
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.