Step 2
Install switch modules or pass-through modules.
1.
Completely open the two ejector levers on a switch or pass-through module, and
horizontally insert the switch or pass-through module into the chassis. See (1) and (2) in
Figure 3-25
Installing a switch or pass-through module
2.
Completely close the two ejector levers on the switch or pass-through module. See (3) in
3.
Use a Phillips screwdriver to tighten the two M3 captive screws on the switch or pass-
through module. See (4) in
4.
to install other switch or pass-through modules.
----End
3.9 Installing a Half-Width Compute Node
During operations, wear protective gloves to prevent personal injury.
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
64