3.10 Installing a Full-Width Compute Node...................................................................................................................... 70
3.11 Installing the PGND Cable and Power Cables........................................................................................................... 76
3.12 Installing Signal Cables.............................................................................................................................................. 82
3.13 Verifying the Installation............................................................................................................................................ 87
5.1 Overview...................................................................................................................................................................... 91
5.2 Default Information...................................................................................................................................................... 92
5.3 Configuring Management Modules..............................................................................................................................96
5.4 Configuring Compute Nodes........................................................................................................................................97
5.5 Configuring Switch Modules........................................................................................................................................98
6.1 Replacing an MM910................................................................................................................................................... 99
6.2 Replacing a Compute Node and Its Components.......................................................................................................103
6.2.1 Replacing a Half-Width/Full-Width Compute Node...............................................................................................104
6.3 Replacing a Switch Module........................................................................................................................................110
6.3.1 Before You Start...................................................................................................................................................... 110
6.3.2 Applying for a License (Only for the CX210 and CX912)..................................................................................... 112
6.3.3 Backing Up the Configuration Files........................................................................................................................ 114
6.3.4 Removing Cables and Optical Modules.................................................................................................................. 115
6.3.5 Removing and Installing a Switch Module..............................................................................................................118
6.3.6 Checking Before Power-On.....................................................................................................................................119
6.3.6.1 Checking Switch Module Startup......................................................................................................................... 119
6.3.6.2 (Optional) Upgrading Software by Using U-Boot............................................................................................... 122
6.3.6.3 (Optional) Deleting the Configuration File of the V8 Version.............................................................................126
6.3.7 Restoring the FC Configuration File....................................................................................................................... 127
6.3.8 Importing and Transferring Licenses (Only for the CX210 and CX912)................................................................128
6.3.9 Installing Cables and Optical Modules....................................................................................................................130
6.3.10 Verifying the Switch Module Configuration......................................................................................................... 132
6.4 Replacing a PSU.........................................................................................................................................................133
6.5 Replacing a Fan Module.............................................................................................................................................139
6.6 Replacing the Chassis Intelligent Display.................................................................................................................. 142
6.7 Replacing the Chassis.................................................................................................................................................148
8.1 Precautions for Capacity Expansion...........................................................................................................................153
8.2 Adding Modules......................................................................................................................................................... 153
8.3 Adding Components of Compute Nodes....................................................................................................................155
E9000 Server
User Guide
Contents
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
viii