Figure 3-42
Installing the full-width compute node
3.
Completely open the ejector levers on the full-width compute node. See (2) in
.
4.
Horizontally insert the full-width compute node into the chassis. See (3) in
.
5.
Close the ejector levers on the full-width compute node. See (4) in
----End
3.11 Installing the PGND Cable and Power Cables
NO TICE
l
To ensure personal and equipment safety, use the recommended power cables.
l
Power cables can be used only for dedicated server devices, and cannot be used for any
other devices.
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
76