1.
Press the ejector release buttons on the filler panel. See (1) in
.
Figure 3-40
Removing the filler panel
2.
Completely open the ejector levers on the filler panel. See (2) in
3.
Pull the filler panel out of the chassis. See (3) in
4.
Close the ejector levers on the filler panel. See (4) in
5.
Place the removed filler panel in an accessory recycling bin.
Step 4
Install the compute node.
1.
(Optional) Remove a partition board. Perform this operation only when there is a
partition board in the slot where a full-width compute node is to be installed.
a.
Press and hold down the hole and push the partition board inwards. See (1) and (2)
in
Figure 3-41
Removing the partition board
b.
Tilt the partition board rightwards and remove it. See (3) and (4) in
2.
Press the ejector release buttons on the full-width compute node. See (1) in
.
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
75