Issue
Date
Description
19
2018-07-02
This issue is the nineteenth official release,
and includes the following changes:
l
.
l
.
l
3.11 Installing the PGND Cable
.
l
.
18
2018-05-29
This issue is the eighteenth official release,
and includes the following changes:
l
.
l
(Only for the CX210 and CX912)
.
l
Transferring Licenses (Only for the
CX210 and CX912)
17
2018-02-28
This issue is the seventeenth official release,
and includes the following changes:
Modified
.
16
2017-04-14
This issue is the sixteenth official release, and
includes the following changes:
l
Added
8 Expanding the E9000 Capacity
.
l
Added the nameplate information of the
2000 W Titanium PSU to
l
Modified the
Altitude
parameter in
15
2016-11-22
This issue is the fifteenth official release, and
includes the following changes:
Added the description about the working
temperature compliance with the ASHRAE
Class A3 standard in
.
14
2016-07-11
This issue is the fourteenth official release, and
includes the following changes:
l
Added
.
l
l
.
13
2015-03-31
This issue is the thirteenth official release.
E9000 Server
User Guide
About This Document
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
iv