NO TICE
l
Before adding switch modules, contact Huawei technical support engineers to determine
the networking configuration based on site requirements.
l
If switch modules are added, the corresponding NICs of the compute nodes must be added.
l
Huawei Server Power Calculator
to determine the quantity and configuration
policies of PSUs. For details about PSU configuration policies, see
l
Determine whether to add fan modules according to the quantity of compute nodes after
capacity expansion. Fan modules are configured based on the following guidelines:
–
When a chassis houses eight or fewer half-width compute nodes, or four or fewer
full-width compute nodes, install fan modules in slots 1, 2, 3, 4, 7, 8, 9, 10, 13, and
14.
–
When a chassis houses more than eight half-width compute nodes or more than four
full-width compute nodes, fully configure fan modules.
Table 8-1
Determining the modules to be added
Module Type
Model
Quantity
Compute node
-
-
Switch module
-
-
Fan module
-
-
PSU
-
-
Step 2
Install the modules to be added. For details, see
.
Step 3
Log in to the MM910 WebUI and click the expansion modules and existing modules to view
and record their software versions.
Figure 8-1
MM910 WebUI
E9000 Server
User Guide
8 Expanding the E9000 Capacity
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
154