l
Step 5
Install a new compute node.
l
Install a half-width compute node.
a.
(Optional) Install a partition board.
You need to install a partition board between two half-width compute nodes. Perform this
operation only when no partition board is installed between two half-width compute nodes.
i.
Tilt the partition board and insert it into the chassis. Align the partition board
with the installation holes and then make the partition board upright. See (1)
and (2) in
ii.
Pull the partition board outward. See (3) and (4) in
The partition board is properly installed when you hear a clicking sound.
Figure 6-8
Installing a partition board
b.
Press the ejector release button on the half-width compute node. See (1) in
.
E9000 Server
User Guide
6 Parts Replacement
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.
107