3.13 Verifying the Installation
Verifying the Chassis Installation
Verify the chassis installation against the check items in
. Rectify any item that does
not meet the requirements.
Table 3-2
Verifying the chassis installation
No.
Check Item
Check Result
1
Labels on the chassis are clear and properly pasted.
-
2
Screws for securing the chassis are properly installed.
-
3
Paint on the chassis is not scraped and the surface is not
stained. Otherwise, apply paint or clean up the stains.
-
4
Filler panels are installed in all vacant slots.
-
5
The instruction manual and accessories delivered with the
product are intact.
-
Verifying the Cable Installation
Verify the cable installation against the check items in
not meet the requirements.
Table 3-3
Verifying the cable installation
No.
Check Item
Check Result
1
Cables are properly routed in the cabinet, complying with
Huawei's cable layout specification.
-
2
Power cables and PGND cables are properly connected.
-
3
PGND cables and power cables are intact without joints.
-
4
Power cables and PGND cables are straight and not
coiled.
-
5
Power cables, PGND cables, and signal cables are bound
separately, and the distance between a power cable and a
signal cable and the distance between a PGND cable and a
signal cable meet requirements.
-
6
Cables are not installed above the heat dissipation holes.
-
7
Cable ties are evenly spaced and properly fastened.
-
8
The bending radius of a cable meets the specifications.
-
E9000 Server
User Guide
3 Installing the E9000
Issue 25 (2019-11-30)
Copyright © Huawei Technologies Co., Ltd.