Basic Configuration
264
Nominal IP Stream Throughput
Nominal IP Stream Throughput
Nominal IP Throughput
Signal
Description
Format
MB per second
Video
3G
ST 2110-20 (59Hz
a
) 327,745,613
Video
3G
ST 2022-6
389,771,715
Video
HD
ST 2110-20 (59Hz) 163,940,697
Video
HD
ST 2022-6
194,886,286
Audio
1-8 Channels
ST 2110-30
1,209,594
Audio
1-16 Channels ST 2110-30
2,768,482
Ancillary
Data
ST 2110-40
10,910
a. ST 2110-20 throughput is dependent on the Video Frame frame rate.
IP Timing Troubleshooting
1
Use IP Statistics to verify throughput for each port. Throughput for similar ports should
have similar numbers (
IP SFP Statistics Web Access
, on page 278).
2
Ports with low numbers are missing signal streams. Check the Receive and Transmit IP
addresses and port numbers.
3
For ports that have no throughput, check the Port Configuration and IP switch setup.
4
Check the cables and SFP connections.
5
If the statistics appear correct but there is no video from the source, it is likely the signal
is out of time. Use the Timing Analyzer to verify the timing (
Timing Analyzer Menu
, on
page 275).
Node Settings
The GV K-Frame XP Node Settings menus are used to establish communications among
various system components. These important settings are not included in Eng Setup
configuration files, to prevent accidental system communication failures if Eng Setup files
are loaded incorrectly.
Frame Suite Nodes & ID Menu
The Frame Suite Nodes & ID menu has fields to enter the IP addresses the GV Switcher
menu application will use to communicate with the Video Processor Frame, Image Store,
and the Control Panel whose DPOPs will affect this application’s menu displays. A menu
restart is required to make IP address changes take effect.
When connected, the currently defined names of these devices are displayed. These
names can be edited from this menu, and will be sent to the device as soon as the new
name has been entered. Subsequent connections to this device from this or another menu
will show that edited name.
Summary of Contents for KARRERA
Page 47: ...Installation Service Manual 23 15 RU Dimensions Side View ...
Page 49: ...Installation Service Manual 25 15RUVideo Processor Views 15 RU Front View withDoor Removed ...
Page 50: ...Frame Installation 26 15 RU Rear ViewIP Gearbox Conversion 15RU Front View withDoor Removed ...
Page 52: ...Frame Installation 28 PowerSupplyFrameDimensions TopView ...
Page 171: ...Installation Service Manual 147 ...
Page 204: ...Basic Configuration 180 ...
Page 208: ...Basic Configuration 184 green ...
Page 234: ...Basic Configuration 210 ...
Page 265: ...Installation Service Manual 241 ...
Page 296: ...External Interfaces 272 PBus and GPI Enables ...
Page 366: ...Maintenance 342 ...
Page 367: ...Installation Service Manual 343 ...
Page 368: ...Maintenance 344 ...