Installation & Service Manual
29
Power Supply Frame Rack Installation and Airflow
The power supply frame used with the 15-RU GV K-Frame XP is ideally rack mounted immediately
above the Video Processor chassis. The power supply frame is then supported by the lower chassis
and eliminates the need for power supply rear rack supports.
In addition, this placement allows removal of the GV K-Frame XP front door.
If the power supply frame is not mounted above the GV K-Frame XP chassis, rear rack supports
are required. If mounting in an alternative location, allow for the 34” DC interconnect cable
length.
Power Supply Rack Installations and Cooling Airflow
Summary of Contents for KARRERA
Page 47: ...Installation Service Manual 23 15 RU Dimensions Side View ...
Page 49: ...Installation Service Manual 25 15RUVideo Processor Views 15 RU Front View withDoor Removed ...
Page 50: ...Frame Installation 26 15 RU Rear ViewIP Gearbox Conversion 15RU Front View withDoor Removed ...
Page 52: ...Frame Installation 28 PowerSupplyFrameDimensions TopView ...
Page 171: ...Installation Service Manual 147 ...
Page 204: ...Basic Configuration 180 ...
Page 208: ...Basic Configuration 184 green ...
Page 234: ...Basic Configuration 210 ...
Page 265: ...Installation Service Manual 241 ...
Page 296: ...External Interfaces 272 PBus and GPI Enables ...
Page 366: ...Maintenance 342 ...
Page 367: ...Installation Service Manual 343 ...
Page 368: ...Maintenance 344 ...