2. Installation Manual
(2)
New E/O box.
If two imaging units are
connected, the 31 I/F expansion
board must be added to this
area (optional).
Mount four
ferrite coresa
Anchor with
insulating locks
If two imaging
units are
connected, the
second one must
be anchored in
the same way.
Mount the
ferrite core
Optical composite
cable
−>
Multibox
(cable slack stopper
fixture)
CXDI-31
Sensor cable
(optional extension)
CXDI-31
Sensor cable
(standard)
Power cable
−>
Sensor power
Connector mount
(fixture provided)
[Fig.2]
(Important points)
Connector must
be completely
inserted.
If the connector is not inserted
completely, there is a possibility
of disconnection
.
[Fig.3]
- -
13
Summary of Contents for CXDI-31
Page 11: ...Labels and Markings Rear iii ...
Page 14: ...Labels and Markings Rear vi ...
Page 18: ......
Page 20: ......
Page 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Page 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Page 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Page 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Page 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Page 184: ......
Page 186: ......
Page 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Page 198: ......