3. CXDI-31 Imaging Unit
- 15 -
(3)
Remove the two screws from the connector-insulating sheet as shown in [Fig.3] below.
(4)
Remove the two cable clamp screws as shown in [Fig.3] below.
[Fig 3]
(5)
Remove the sensor cable and the connector connected to PCB in the direction shown by
the arrow.
[Fig.4]
Note:
Be sure not to remove the connector on the opposite side of the flat cable when removing
and attaching the sensor cable to the connector base.
Flat cable
Connector base
Insulating sheet
Screw
Screw
Summary of Contents for CXDI-31
Page 11: ...Labels and Markings Rear iii ...
Page 14: ...Labels and Markings Rear vi ...
Page 18: ......
Page 20: ......
Page 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Page 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Page 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Page 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Page 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Page 184: ......
Page 186: ......
Page 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Page 198: ......