2 Installation Manual
- 89 -
Take the SMPTE pattern image again. On the QA screen, compare the image displayed on
the operation unit screen with the film image printed in Step 4) above or with the image on
the high-definition monitor. Make sure there is no difference in contrast and gradation
between those images. Check both preview and magnify images.
If there are any differences between these images, perform the procedure described in “(4)
Operation Unit Image Gamma Correction” on the next page.
If there are no differences between these images, the steps are complete.
(3)
Operation Unit Image Gamma Correction
1) On the QA screen displayed on Step (3) 5) above, select the “Option” tab and press the
“Gamma Adjustment” button. [Fig. 3]
[Fig. 3]
Summary of Contents for CXDI-31
Page 11: ...Labels and Markings Rear iii ...
Page 14: ...Labels and Markings Rear vi ...
Page 18: ......
Page 20: ......
Page 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Page 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Page 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Page 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Page 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Page 184: ......
Page 186: ......
Page 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Page 198: ......