2 Installation Manual
- 114 -
E) The sensors are set to READY status a few seconds after the first irradiation ends, so
continue and perform the second, third and fourth irradiations.
(Perform four irradiations to test whether the Pre Delay time is stable in Phase1.)
[Phase1 complete screen]
[Fig.7]
Check the stability of the pre-delay in Phase1 and determine the X-ray time-out value (internal
parameter) to be used for Phase2.
(The Phase1 measurement results are saved in the [phase1.ers] file.)
This example shows the X-ray irradiation time to be used in Phase2 as 172 msec, but the
irradiation time often cannot be set on the X-ray generator side in such fine increments.
In these cases, set the closest value (180 or 200 msec) that can be used for irradiation.
A = maximum Pre Delay measurement value
Xtmo = A + 10 msec
Irradiation time used in Phase2 = Xtmo + 100 msec
Summary of Contents for CXDI-31
Page 11: ...Labels and Markings Rear iii ...
Page 14: ...Labels and Markings Rear vi ...
Page 18: ......
Page 20: ......
Page 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Page 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Page 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Page 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Page 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Page 184: ......
Page 186: ......
Page 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Page 198: ......