2 Installation Manual
- 115 -
(3) Measuring with a tentative Pre Delay
When the Phase2 button is selected, Pre Delay = 0, Post Delay = 255 is automatically set
internally.
A-1) Set the X-ray generator to the following imaging conditions.
[Imaging conditions] X-ray tube voltage: 100 kV
X-ray tube current:
50 mA
Irradiation time:
Value close to the value obtained in Phase1
(180 or 200 msec in the example in B-5)
Focal distance:
Align with the grid used.
Phototimer:
Disabled
(OFF)
A-2) Only mAs will be displayed according to the X-ray generator being used. In this case, set
the exposure conditions as follows.
[Imaging conditions] X-ray tube voltage: 100 kV
X-ray tube current:
50 mA
mAs:
Set the mAs vale between 2.0mAs and
4.0mAs
Focal distance:
Align with the grid used.
Phototimer:
Disabled
(OFF)
B) Select the [Phase2] button and select the [Execute] button like Phase1 to set the sensors to
READY status. Then press the [Expose] button on the X-ray generator to irradiate
X-rays.
After 10 irradiations in Phase2, [Pre Delay time] and [Post Delay time] are automatically
calculated and displayed.
(The Phase2 measurement results are saved in the [phase2.ers] file.)
[Phase2 complete screen]
[Fig.8]
Summary of Contents for CXDI-31
Page 11: ...Labels and Markings Rear iii ...
Page 14: ...Labels and Markings Rear vi ...
Page 18: ......
Page 20: ......
Page 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Page 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Page 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Page 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Page 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Page 184: ......
Page 186: ......
Page 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Page 198: ......