2 Installation Manual
- 116 -
(4) Checking with the measured Pre Delay and Post Delay
When the Phase3 button is selected, the Pre Delay and Post Delay measured in Phase2 are
automatically set.
A) Select the [Phase3] button and select the [Execute] button like Phase2 to set the sensors to
READY status. Then press the [Expose] button on the X-ray generator to irradiate X-rays.
Phase3 ends automatically after 3 irradiations in Phase3.
At this time, check that a value close to the Pre Delay measured in Phase2 is output to
[a], and a value close to the irradiation time set by the X-ray generator is output to [b].
[Phase3 complete screen]
[Fig.9]
Summary of Contents for CXDI-31
Page 11: ...Labels and Markings Rear iii ...
Page 14: ...Labels and Markings Rear vi ...
Page 18: ......
Page 20: ......
Page 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Page 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Page 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Page 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Page 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Page 184: ......
Page 186: ......
Page 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Page 198: ......