2 Installation Manual
- 52 -
Parameter List (Separate Document 1)
DICOM storage device
In the CXDI, DICOM data transfer is performed using the transfer software module
“send_image” .The settings for these parameters are described below.
(1) -m maxPDU
(2) -t calledTitle
(3) -c callingtitle
(4) -s SOPName
(5) -I
(6) -d FAC
(7) –v
(8) -jn
(9) –k
(1) -m maxPDU
-m maxPDU
Maximum PDU value in byte units
Meaning
* The CXDI automatically uses 131072 internally for operation.
* Designating a specific value allows overwriting of the above value.
Description * The DICOM standards do not allow values of 1301073 or higher to be set.
* This is used when the operator of the connected storage device requests a size
change.
* In DICOM printing, note that the argument title changes to -u.
(
Æ
See the printing parameters.)
(2) -t calledTitle
-t calledTitle
Called App Entity Title
Meaning
* The AE Title setting field is automatically applied to this setting.
* Designating a specific value allows overwriting of the above value.
Description * Note that the meaning is opposite of the DICOM printing argument -c.
(
Æ
See the printing parameters.)
* This is used when the operator of the connected storage device requests a
change in the installed
identification information (version).
(3) -c callingtitle
-c callingtitle
calling App Entity Title
Meaning
* The CXDI automatically uses CANON_CCR internally for the operation.
* Designating a specific value allows overwriting of the above value.
Description * Note that the meaning is opposite of the DICOM printing argument -c.
(
Æ
See the printing parameters.)
* This is used when the operator of the connected storage device requests a
change in the installed
identification information (version).
(4) -s SOPName
-s SOPName
(for reference)
This parameter designates the class used for connecting the association at the start of the
transfer.(CR/T/MR/NM/SC/US)
Meaning
* This is not used in the CXDI.
Description
Summary of Contents for CXDI-31
Page 11: ...Labels and Markings Rear iii ...
Page 14: ...Labels and Markings Rear vi ...
Page 18: ......
Page 20: ......
Page 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Page 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Page 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Page 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Page 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Page 184: ......
Page 186: ......
Page 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Page 198: ......