13-38
Testing and Maintenance
BE1-951
Command
Purpose
SL-N=27_59
Sets 27_59 as custom logic name
SG-VTP=1,4W,PN,PN
Set VT phase voltage parameters
SA-MAJ=0
Disables major Alarm.
SL-27P=1,0
Enables 27P, disables blocking
SL-59P=1,0
Enables 59P, disables blocking
SL-VO1=27PT+59PT
Enables OUT1 to close for 27P or 59P trip
SG-TRIG=27PT+59PTU,27PPU+59PPU,0
Enables 27P and 59P to log and trigger fault record.
EXITY;Y
Exit and save settings
Step 2 Using Table 13-50 as a guide, transmit the first row of setting commands (highest 27P PU, lowest
59P PU) to the relay.
Table 13-50. 27P and 59P Pickup Settings
Phase Pickup Settings
Purpose
Undervoltage
Overvoltage
S0-27P=96,50ms
S0-59P=132,50ms
Sets 27P PU at 96 V, 59P at 132 V, TD at min
S0-27P=84,50ms
S0-59P=144, 50ms
Sets 27P PU at 84 V, 59P at 144 V, TD at min
S0-27P=72,50ms
S0-59P=156, 50ms
Sets 27P PU at 72 V, 59P at 156 V, TD at min
Step 3 Prepare to monitor the 27P and 59P function operation. Operation can be verified by monitoring
Out 1.
Step 4 Connect and apply a 120 Vac, three-phase voltage source to terminals C13 (A-phase), C14
(B-phase), C15 (C-phase) and C16 (Neutral). Refer to Figure 13-1 for terminal locations.
Step 5
Slowly decrease the A-phase voltage until OUT1 closes. Pickup should occur 2 percent or
1 volt of the 27P pickup setting. Slowly increase the A-phase voltage until OUT1 opens. Dropout
should occur between 102 and 103 percent of the actual pickup value. Verify the 27A target and
the HMI. Reset the target.
Step 6
Continue increasing the A-phase voltage until OUT1 closes. Pickup should occur within +2 percent
or 1 volt of the 59P pickup setting. Slowly reduce the A-phase voltage until OUT1 opens. Dropout
should occur between 97 and 98 percent of the actual pickup value. Verify 59A target on the HMI.
Step 7 Verify the pickup and dropout accuracy of the middle and upper pickup settings listed in table 13-
47.
Step 8 (Optional) Repeat Steps 2 through 7 for the B-phase and C-phase voltage inputs.
Step 9 (Optional) Repeat Steps 2 through 8 for setting groups 1, 2, and 3.
Phase Undervoltage and Overvoltage Timing Verification
Step 1 Using Table 13-51 as a guide, transmit the first row of setting commands to the relay.