13-20
Testing and Maintenance
BE1-951
Table 13-12. 150T Time Delay Commands
Command
Purpose
A=
Gain write access
SL-150T=1,0
Enables 150TP, disables blocking
SL-VO1=150TPT
Enables OUT1 to close for 150TP trip
SL-VO2=150TNT
Enables OUT2 to close for 150TN trip
SG-TRIGGER=150TNT,
150TNPU,0
Enable 150TPT or 150TNT to log and trigger fault
recording
EXITY;Y
Exit and save settings
Step 8 (Optional) Repeat Steps 1 through 7 for the 50T and 150T elements in setting groups 1, 2, and 3.
Before testing settings in other setting groups, a setting group must be selected using the
CS/CO-GROUP commands. To activate setting group 1, CS-GROUP=1 would be entered to select
setting group 1 and CO-GROUP=1 would be entered to make setting group 1 active.
Also, the pickup settings made in Step 3 (Table 13-11) must be changed to specify the setting group
being tested. To test settings in group 1, replace the 0 in the S0-x50 commands with a 1 (S1-x50).
50/150TQ Pickup and Dropout Verification
Purpose: To verify the operation of the 50TQ and 150TQ elements.
Reference Commands: SL-50T/150T
Step 1 Connect a current source to terminals D1 and D2 (A-phase).
Step 2 Prepare the 50TQ and 150TQ elements for testing by transmitting the commands in Table 13-13
to the relay. Reset Targets.
Table 13-13. 50TQ Pickup Commands
Command
Purpose
A=
Gain write access
SL-N=NONE
Zero out custom settings. Overwrite with logic=none settings.
Y
Confirm overwrite
SL-N=Q50
Sets Q50 as custom logic name
SL-50TQ=1,0
Enables 50TQ, disables blocking
SL-VO1=50TQT
Enables OUT1 to close for 50TQ trip
SG-CT=1
Sets CT ratio at 1
SG-TRIGGER=50TQT,50TQPU,0
Enable 50TQT to log and trigger fault recording
EXITY;Y
Exit and save settings
Step 3 Using Table 13-14, transmit the first row of setting commands for your sensing input type.