Azbil Corporation
Instrument installation
Model MTG11A/18A, MTG11B/18B, MTG14C
2-5
• No straight pipe section is basically needed on the downstream side. However,
ensure 2D or over if influences of drift are foreseen.
• Select an installation location where there is no major flow pulsation or vibration
(away from a pump)
• Ensure adequate maintenance space.
Figure 2-3 Maintenance space
400 mm
400 mm
400 mm
400 mm