
NRT
Brief Instructions
1080.9506.02
3.1
E-6
3 Remote
Control
Introduction
The instrument is equipped with an IEC/IEEE-bus interface according to standard IEC 625.1/IEEE 488.1
and a RS-232 interface. The connectors are located at the rear of the instrument and permit to connect
a controller for remote control.
The instrument supports the SCPI version 1994.0 (Standard Commands for Programmable Instru-
ments). The SCPI standard is based on standard IEEE 488.2 and aims at the standardization of de-
vice-specific commands, error handling and the status registers (see Section 3.4.1, "SCPI Introduc-
tion").
This section assumes basic knowledge of IEC/IEEE-bus programming and operation of the controller. A
description of the interface commands can be obtained from the relevant manuals.
The requirements of the SCPI standard placed on command syntax, error handling and configuration of
the status registers are explained in detail in the respective sections. Tables provide a fast overview of
the commands implemented in the instrument and the bit assignment in the status registers. The tables
are supplemented by a comprehensive description of every command and the status registers. Detailed
programming examples of the essential functions can be found in Annex D. The examples are all writ-
ten in QuickBASIC.
Note:
In contrast to manual control, which is intended for maximum possible operating convenience,
the priority of remote control is the "predictability" of the device status. This means that when in-
compatible settings (e.g. simultaneous activation of an average (AVG) and PEP-measurement)
are attempted, the command is ignored and the device status remains unchanged, i.e. is not
adapted to other settings. Therefore, IEC / IEEE-bus control programs should always define an
initial device status (e.g. with the command *RST) and then implement the required settings.
3.1 Brief
Instructions
The short and simple operating sequence given below permits to put the instrument into operation
quickly and set its basic functions.
3.1.1 IEC/IEEE-bus
It is assumed that the NRT is connected to the power supply and the IEC/IEEE-bus address is set to 12
(factory setting).
½
Connect instrument to controller using IEC/IEEE-bus cable.
½
Write and start the following program on the controller (for <n> insert the number of the selected sen-
sor port (0: NRT-B1, 1: front panel connector)):
CALL IBFIND(
"
DEV1
"
, sensor%)
Open port to the instrument
CALL IBPAD(sensor%, 12)
Inform controller about instrument address
CALL IBWRT(sensor%,
"
*RST;*CLS;*WAI
"
)
Reset instrument
CALL IBWRT(sensor%,
"
:SENS<n>:FREQ DEF
"
)
Switch off frequency response correction
CALL IBWRT(sensor%,
"
:SENS<n>:POW:REF 27dBm
"
)
Set reference power to 27 dBm
CALL IBWRT(sensor%,
"
:SENS<n>:FUNC
’POW:FORW:AVER’
"
)
Switch on average power measurement
深圳德标仪器
135-1095-0799
Содержание NRT 1080.9506.02/.62
Страница 2: ...深圳德标仪器 135 1095 0799 ...
Страница 4: ...深圳德标仪器 135 1095 0799 ...
Страница 6: ...深圳德标仪器 135 1095 0799 ...
Страница 16: ...深圳德标仪器 135 1095 0799 ...
Страница 18: ...深圳德标仪器 135 1095 0799 ...
Страница 178: ...深圳德标仪器 135 1095 0799 ...
Страница 190: ...深圳德标仪器 135 1095 0799 ...