![Rohde & Schwarz CMU-K20 Скачать руководство пользователя страница 132](http://html.mh-extra.com/html/rohde-and-schwarz/cmu-k20/cmu-k20_operating-manual_1477804132.webp)
Non Signalling: Modulation Measurements
CMU-K20/K21/K22/K23/K24
1115.6088.12 4.54
E-11
quantities must fall below the specified positive limit). In contrast to the
Power
measurement where individual limit lines can be switched off, the
Modulation
limit
check is always active.
Remote control
CONFigure:MODulation:XPERror[:GMSK]:LIMit[:CURRent]
<PhaseErrorPeak>,<PhaseErrorRMS>,<FrequencyError>
深圳德标仪器
135-1095-0799
Содержание CMU-K20
Страница 4: ...深圳德标仪器 135 1095 0799 ...
Страница 8: ...深圳德标仪器 135 1095 0799 ...
Страница 10: ...深圳德标仪器 135 1095 0799 ...
Страница 12: ...深圳德标仪器 135 1095 0799 ...
Страница 18: ...深圳德标仪器 135 1095 0799 ...
Страница 24: ...深圳德标仪器 135 1095 0799 ...
Страница 26: ...深圳德标仪器 135 1095 0799 ...
Страница 34: ...深圳德标仪器 135 1095 0799 ...
Страница 58: ...深圳德标仪器 135 1095 0799 ...
Страница 60: ...深圳德标仪器 135 1095 0799 ...
Страница 78: ...深圳德标仪器 135 1095 0799 ...
Страница 286: ...深圳德标仪器 135 1095 0799 ...
Страница 288: ...深圳德标仪器 135 1095 0799 ...
Страница 304: ...深圳德标仪器 135 1095 0799 ...
Страница 632: ...深圳德标仪器 135 1095 0799 ...