Tests /
573
N0130943 02
Modular ICS 7.1 Installer Guide
Operating a payload loopback test
Installer password required
Start with the display showing
Loopback tests:
.
1. Press
≠
.
Show Module:
displays.
2. Enter a module number or press
LIST
to scroll through
modules.
Cards on KSU
or
Card on Mod X
displays.
3. If you want to test cartridges on another module, press
‘
until the display shows the module.
4. Press
≠
.
Cd1-KSU
or
Cd1-ModX
displays.
If you want to test the second cartridge on the KSU, press
‘
to display
Cd2-KSU
or
Cd1-ModX
.
5. Press
≠
.
• If there is an analog cartridge in the slot or the slot is
empty, the display shows
Need digital crd
.
• If there is a BRI cartridge with U-NT or S/T loops, the
display shows
Loop nnn
.
6. Press
≠
.
Payload loopback
displays.
7. Press
START
to begin the test.
Payload running
displays.
8. Press
STOP
to end the test.
Note:
You can exit programming or move on to other
programming or loop testing while the test is running.
All calls on a BRI loop are dropped when you
start loopback test.
While the loopback test is in progress, the BRI
lines go out of service. There is no warning from
the system. Pick an appropriate time to do a test
and warn users that they will lose any calls in
progress.
Содержание Modular ICS 7.1
Страница 2: ......
Страница 46: ...46 How to use this document Modular ICS 7 1 Installer Guide N0130943 02...
Страница 72: ...72 Welcome to ISDN Modular ICS 7 1 Installer Guide N0130943 02...
Страница 102: ...102 Remote system access Modular ICS 7 1 Installer Guide N0130943 02...
Страница 108: ...108 Controlling system access Modular ICS 7 1 Installer Guide N0130943 02...
Страница 192: ...192 ETSI MCDN and Network features Modular ICS 7 1 Installer Guide N0130943 02...
Страница 290: ...290 Modular ICS 7 1 Installer Guide N0130943 02...
Страница 582: ...582 Link Status Modular ICS 7 1 Installer Guide N0130943 02...
Страница 586: ...586 Usage Metrics Modular ICS 7 1 Installer Guide N0130943 02...