Testing 6 - 9
the RFA and FA LEDs on the control panel and RFA lamp
on the test set light.
2. Turn the Power switch Off, then back On. The rectifier
should start, and the LEDs lights should go off.
3. Repeat Steps (1) and (2) at the F2 and F3 fuses on CM1.
Current Limit
Test
Notes
Adjust the current limit only after verifying that a current limit
problem exists. It is recommended that this test be performed on
battery.
V
out
is the voltage reading between the rectifier output bus bars.
See Figure 5-3.
1. Connect the test meter to the Test Load bus bar at the
bottom of CB1 and the +V output bus bar.
2. Strap a short across E18 to E33 on CM2, see Figure 6-3.
3. At I
load
= 200-202A, 100 to 101 percent of rated output
current, use the Float Adj potentiometer to adjust V
out
to
52.08 (26.04) volts.
4. Remove strap from E18 to E33. Observe that V
out
is 51.98
(25.99) to 52.03 (26.0) volts. If not, see Section 7.
5. Increase the load, as indicated on the load box to 218-222
amperes, 110± 1 percent. V
out
should be below 51.58
(25.9) volts. If not, see Section 7.
6. Decrease the load to 192-196A, 96 to 98 percent of the
rectifier rating. Observe that V
out
is greater than 52.03
(26.01) volts.
Phase Failure
Alarm (PHA)
Test
1. Set the load to 100-120A, 50 to 60 percent of the rectifier's
rated amperage.
2. With the Power switch still On, turn off the ac service and
note that the rectifier shuts down and that both the PWR
and MAN lamps on the test set go off.
Содержание Lineage 2000 J85503B-2
Страница 2: ......
Страница 4: ......
Страница 12: ...Lucent Technologies Lineage 2000 200A Ferroresonant Rectifier J85503B 2 2 List of Figures Issue 8 January 1999 ...
Страница 18: ...Lucent Technologies Lineage 2000 200A Ferroresonant Rectifier J85503B 2 1 4 Introduction Issue 8 January 1999 ...
Страница 72: ...Lucent Technologies Lineage 2000 200A Ferroresonant Rectifier J85503B 2 5 22 Installation Issue 8 January 1999 ...