Testing 6 - 3
Test Load
Connection
Use the following procedures to connect a test load when called
for in a test or other procedure. Test load connections are made
on the internal bus of the rectifier. Therefore, to isolate the
rectifier from the batteries and plant bus, the rectifier DC
Output circuit breaker must be left open (off) while the test load
is connected.
1. At the ac service panel, remove ac power to the rectifier.
2. Turn off (down) the rectifier CB1 circuit breaker.
Warning
Support the CM4 interface board with your hands when
disconnecting the cable leads or damage to the interface board
may result.Do NOT disconnect plant control cable connector
J5A from interface board CM4 by pulling the cable.
3. Disconnect J5A from CM4 by unlatching first, then
pulling the cable connector.
4. Refer to Figure 5-3 and connect the test load between the
input bus to circuit breaker CB1, (labeled Test Load), and
any convenient point on the ground bus anywhere in the
plant.
Содержание Lineage 2000 J85503B-2
Страница 2: ......
Страница 4: ......
Страница 12: ...Lucent Technologies Lineage 2000 200A Ferroresonant Rectifier J85503B 2 2 List of Figures Issue 8 January 1999 ...
Страница 18: ...Lucent Technologies Lineage 2000 200A Ferroresonant Rectifier J85503B 2 1 4 Introduction Issue 8 January 1999 ...
Страница 72: ...Lucent Technologies Lineage 2000 200A Ferroresonant Rectifier J85503B 2 5 22 Installation Issue 8 January 1999 ...