3-2
745 Transformer Management Relay
GE Multilin
3.1 DRAWOUT CASE
3 INSTALLATION
3
3.1.3 CASE MOUNTING
Before mounting the SR unit in the supporting panel, remove the relay portion from its case, as described in the next sec-
tion. From the front of the panel, slide the empty case into the cutout. To ensure the front bezel sits flush with the panel,
apply pressure to the bezel’s front while bending the retaining tabs 90°. These tabs are located on the sides and bottom of
the case and appear as shown in the illustration. After bending all tabs, the case will be securely mounted so that its relay
can be inserted. The SR unit is now ready for panel wiring.
Figure 3–3: CASE MOUNTING
3.1.4 UNIT WITHDRAWAL AND INSERTION
Turn off Control Power before drawing out or re-inserting the relay to prevent maloperation!
a) RELAY WITHDRAWAL
1.
Open the door by pulling from the center of its right side. It will rotate to the left about its hinges.
2.
Press upward on the locking latch, which is located below the handle, and hold in its raised position. The tip of a small
screwdriver may prove helpful in this operation.
3.
With the latch raised, pull the center of the handle outward. Once disengaged, continue rotating the handle up to the
stop position.
CAUTION
PRESS LATCH UP AND PULL
HANDLE
ROTATE HANDLE TO STOP
POSITION
Содержание TRANSFORMER MANAGEMENT RELAY 745
Страница 2: ...Courtesy of NationalSwitchgear com ...