execute command
phase A
t1>tExecutionFB, then
long-operation-time in
'cause' is set
open
close
close
open
phase C
close
open
phase B
t1
tExecutionFB
timer
command termination
phase A
command termination
phase B
command termination
phase C
command termination
circuit breaker open
close
* The command termination will be delayed one execution sample.
*
en05000094_ansi.vsd
ANSI05000094 V1 EN
Figure 192:
tExecutionFB
The parameter
tSynchrocheck
is used to define the maximum allowed time between the
execute command and the input SYNC_OK to become true. If SYNC_OK=true at the
time the execute command signal is received, the timer "tSynchrocheck" will not start.
The start signal for the synchronizing is obtained if the synchronism-check conditions are
not fulfilled.
execute command
SY_INPRO
SYNC_OK
t2>tSynchronizing, then
blocked-by-synchronism
check in 'cause' is set
tSynchrocheck
t1
START_SY
tSynchronizing
t2
en05000095_ansi.vsd
ANSI05000095 V1 EN
Figure 193:
tSynchroCheck and tSynchronizing
Section 11
1MRK 506 335-UUS A
Control
404
Technical manual
Содержание REL650 series
Страница 1: ...Relion 650 series Line distance protection REL650 ANSI Technical manual ...
Страница 2: ......
Страница 42: ...36 ...
Страница 48: ...42 ...
Страница 58: ...52 ...
Страница 68: ...62 ...
Страница 74: ...68 ...
Страница 194: ...188 ...
Страница 534: ...528 ...
Страница 580: ...574 ...
Страница 722: ...716 ...
Страница 792: ...786 ...
Страница 855: ...849 ...