6.2.6.6
Simplified logic diagrams
presents schematically the creation of the phase-to-phase and phase-to-ground
operating conditions. Consider only the corresponding part of measuring and logic
circuits, when only a phase-to-ground or phase-to-phase measurement is available within
the IED.
ANSI09000149-2-en.vsd
AND
AND
AND
Bool to
integer
DLECND
STPG
STPP
IRELPG
IRELPP
BLOCK
AND
Load encroachment block
0
20ms
0
10ms
0
15ms
0
15ms
0
3
I
IMinPUPG
<
0
max
3 0
_
3
100
I BLK PP
I
Iph
<
×
0
3
0.5
I
IMinPUPG
³
×
0
3 0
_
3
100
max
I Enable PG
I
Iph
³
×
ANSI09000149 V2 EN
Figure 61:
Phase-to-phase and phase-to-ground operating conditions (residual
current criteria)
A special attention is paid to correct phase selection at evolving faults. A DLECND output
signal is created as a combination of the load encroachment characteristic and current
criteria, refer to figure
. This signal can be configured to STCND functional input
signals of the distance protection zone and this way influence the operation of the phase-
to-phase and phase-to-ground zone measuring elements and their phase related pickup
and tripping signals.
presents schematically the composition of non-directional phase selective
signals NDIR_A (B or C). Internal signals ZMn and ZMmn (m and n change between A,
B and C according to the phase) represent the fulfilled operating criteria for each separate
loop measuring element, that is, within the characteristic.
Section 6
1MRK 506 335-UUS A
Impedance protection
142
Technical manual
Содержание REL650 series
Страница 1: ...Relion 650 series Line distance protection REL650 ANSI Technical manual ...
Страница 2: ......
Страница 42: ...36 ...
Страница 48: ...42 ...
Страница 58: ...52 ...
Страница 68: ...62 ...
Страница 74: ...68 ...
Страница 194: ...188 ...
Страница 534: ...528 ...
Страница 580: ...574 ...
Страница 722: ...716 ...
Страница 792: ...786 ...
Страница 855: ...849 ...