6.7.2
Requirements for commissioning
Requirements
Table 6-7
Requirements for commissioning
Step
Prior Activity
See...
1
ET 200iSP is installed
Chapter "AUTOHOTSPOT"
2
PROFIBUS address is set on the ET 200iSP
Chapter "AUTOHOTSPOT"
3
ET 200iSP is wired up
Chapter "AUTOHOTSPOT"
4
Zone 1, zone 21, zone 2 and zone 22: Additional
check of the installation and wiring of the ET 200iSP,
connections, enclosure, and supply lines.
5
The project engineering of the ET 200iSP is comple‐
ted (configuration and parameter assignment)
Chapter "Basics of commissioning
6
The power supply for the DP master is on
Manual to the DP master
7
DP master switched to RUN operating state
Manual to the DP master
See also
General Rules and Regulations for Wiring (Page 103)
6.7.3
Commissioning the ET 200iSP
Commissioning the ET 200iSP
Table 6-8
Commissioning the ET 200iSP
Step
Procedure
See
1
Turn on the power supply for the ET 200iSP.
Section "AUTOHOTSPOT"
2
Watch the STATUS LEDs on the ET 200iSP and on
the DP master.
commissioning and diagnostics
(Page 133)"
●
Manual to the DP master
Commissioning and Diagnostics
6.7 Commissioning and starting up the ET 200iSP