LIFEPAK 20/20e Defibrillator/Monitor
Replacement Procedures
Front Case
(continued)
Front Case Installation
(continued)
5. Connect the W18 UI Flex Cable to the A05 UI PCB at J36.
6. Unlatch the Display CN101 connector Lock on the A02 PP PCB.
7. Install the W18 UI Flex Cable under the latch on the A02 PP PCB at CN101
connector until seated, then close the latch.
8. Connect the two grounding harnesses (219) by connecting the top of the
front case to the system shield, using two new screws (173); torque to 6.8 in-
lb. Refer to
placement.
9. Return to
9-36