LIFEPAK 20/20e Defibrillator/Monitor
Preventive Maintenance
Maintenance and Testing Guidelines
Periodic maintenance, inspection, and testing of the device will help prevent
possible electrical and mechanical problems. Refer to the
Operator Checklist
in
the operating instructions for additional items.
The following table shows the schedule for preventive maintenance activities.
For items that should be replaced at regular intervals, refer to scheduled
replacement Items shown below.
Activity
As Needed
Scheduled
Performance inspection procedure (PIP)
X
Annually
Test and calibration procedures (TCP)
X
X
X
X
X
5 years
A07 battery replacement (service life
minimum of 2 years)
X
7-2