Prepare the Server for Cold Service
b.
(Optional) Release and reposition the CMA to access to the back of the
server.
c.
At the front of the server, release the slide rails by pushing the two green
latches inward.
d.
Slowly pull the server forward until both slide rails lock at the fully extended
maintenance position.
The locking action is accompanied by an audible click. The server is now in the
maintenance position and ready for service.
5.
(Optional) Remove the server entirely from the rack.
“(Optional) Remove the Server from the Rack” on page 99
6.
Set up an ESD-safe service location.
Preparing to Service the Server
97
Summary of Contents for X5-4
Page 1: ...Oracle Server X5 4 Service Manual Part No E56396 03 December 2015 ...
Page 2: ......
Page 10: ...10 Oracle Server X5 4 Service Manual December 2015 ...
Page 14: ...14 Oracle Server X5 4 Service Manual December 2015 ...
Page 21: ...Server Subsystems Overview Two CPU Block Diagram Oracle Server X5 4 Overview 21 ...
Page 36: ...36 Oracle Server X5 4 Service Manual December 2015 ...
Page 68: ...68 Oracle Server X5 4 Service Manual December 2015 ...
Page 178: ...178 Oracle Server X5 4 Service Manual December 2015 ...
Page 272: ...272 Oracle Server X5 4 Service Manual December 2015 ...
Page 340: ...340 Oracle Server X5 4 Service Manual December 2015 ...