Return the Server to the Normal Rack Position
Return the Server to the Normal Rack Position
1.
Release the slide rails from the fully extended position by pushing the release
tabs on the side of each rail.
2.
While pushing on the release tabs, slowly push the server into the rack.
Ensure that the cables do not get in the way.
3.
Reconnect the cables to the back of the server.
If the cable management arm (CMA) is in the way, disconnect the left CMA release and swing
the CMA open.
4.
Reconnect the CMA.
Swing the CMA closed and latch it to the left rack rail.
270
Oracle Server X5-4 Service Manual • December 2015
Summary of Contents for X5-4
Page 1: ...Oracle Server X5 4 Service Manual Part No E56396 03 December 2015 ...
Page 2: ......
Page 10: ...10 Oracle Server X5 4 Service Manual December 2015 ...
Page 14: ...14 Oracle Server X5 4 Service Manual December 2015 ...
Page 21: ...Server Subsystems Overview Two CPU Block Diagram Oracle Server X5 4 Overview 21 ...
Page 36: ...36 Oracle Server X5 4 Service Manual December 2015 ...
Page 68: ...68 Oracle Server X5 4 Service Manual December 2015 ...
Page 178: ...178 Oracle Server X5 4 Service Manual December 2015 ...
Page 272: ...272 Oracle Server X5 4 Service Manual December 2015 ...
Page 340: ...340 Oracle Server X5 4 Service Manual December 2015 ...