(Optional) Install the Server Into the Rack
13.
Secure the power cords with the power cord retaining clips.
14.
Connect any other cables to their connectors or ports on the back of the server.
If the cable management arm (CMA) is in the way, disconnect the left CMA release and swing
the CMA open.
15.
If necessary, reconnect the CMA.
See
“(Optional) Install Cable Management Arm” on page 266
.
Swing the CMA closed and latch it to the left rack rail.
16.
Power on the server.
See
“Power On the Server” on page 271
.
(Optional) Install the Server Into the Rack
Before You Begin
When preparing the server for operation, use these optional steps to install the server in the
rack.
Caution -
Physical or component damage. The server is heavy and cannot be safely installed in
the rack by a single person. Use multiple personnel and a mechanical lift to install the server in
the rack.
262
Oracle Server X5-4 Service Manual • December 2015
Summary of Contents for X5-4
Page 1: ...Oracle Server X5 4 Service Manual Part No E56396 03 December 2015 ...
Page 2: ......
Page 10: ...10 Oracle Server X5 4 Service Manual December 2015 ...
Page 14: ...14 Oracle Server X5 4 Service Manual December 2015 ...
Page 21: ...Server Subsystems Overview Two CPU Block Diagram Oracle Server X5 4 Overview 21 ...
Page 36: ...36 Oracle Server X5 4 Service Manual December 2015 ...
Page 68: ...68 Oracle Server X5 4 Service Manual December 2015 ...
Page 178: ...178 Oracle Server X5 4 Service Manual December 2015 ...
Page 272: ...272 Oracle Server X5 4 Service Manual December 2015 ...
Page 340: ...340 Oracle Server X5 4 Service Manual December 2015 ...