![Oracle X5-4 Service Manual Download Page 209](http://html1.mh-extra.com/html/oracle/x5-4/x5-4_service-manual_1646185209.webp)
Replace the SAS 12 Gb/s Internal HBA ESM Cable (FRU)
Note -
Any excess cable length should be in the PCIe card area to allow better air flow through
the disk backplane area.
11.
Reinstall the P0 MR0/MR1 memory risers you removed earlier.
“Install a Memory Riser Card” on page 152
.
12.
Prepare the server for operation.
“Prepare the Server for Operation” on page 259
.
Replace the SAS 12 Gb/s Internal HBA ESM Cable
(FRU)
1.
Prepare the server for service.
“Prepare the Server for Cold Service” on page 94
2.
Disconnect the ESM cable from the HBA card in PCIe slot 2 and the ESM module.
Servicing FRU Components
209
Summary of Contents for X5-4
Page 1: ...Oracle Server X5 4 Service Manual Part No E56396 03 December 2015 ...
Page 2: ......
Page 10: ...10 Oracle Server X5 4 Service Manual December 2015 ...
Page 14: ...14 Oracle Server X5 4 Service Manual December 2015 ...
Page 21: ...Server Subsystems Overview Two CPU Block Diagram Oracle Server X5 4 Overview 21 ...
Page 36: ...36 Oracle Server X5 4 Service Manual December 2015 ...
Page 68: ...68 Oracle Server X5 4 Service Manual December 2015 ...
Page 178: ...178 Oracle Server X5 4 Service Manual December 2015 ...
Page 272: ...272 Oracle Server X5 4 Service Manual December 2015 ...
Page 340: ...340 Oracle Server X5 4 Service Manual December 2015 ...