Verify Operation of Slide-Rails and CMA
Note -
Two people are recommended for this procedure: one to move the server in and out of
the rack, and one to observe the cables and CMA.
1.
Slowly pull the server out of the rack until the slide-rails reach their stops.
2.
Inspect the attached cables for any binding or kinks.
3.
Verify that the CMA extends fully from the slide-rails.
4.
Push the server back into the rack, as described in the following sub-steps.
When the server is fully extended, you must release two sets of slide-rail stops to return the
server to the rack:
a.
Push in both green levers simultaneously and slide the server toward the
rack.
The first set of stops are levers located on the inside of each slide-rail, just behind the back
panel of the server.
The server slides in approximately 18 inches (46 cm) and stops.
Verify that the cables and the CMA retract without binding before you continue.
b.
Push the server completely into the rack until both slide-rail locks engage.
The second set of stops are the slide-rail release buttons, located near the front of each
mounting bracket. Simultaneously push both of the green slide-rail release buttons.
5.
Adjust the cable straps and CMA, as required.
Returning the Server to Operation
269
Summary of Contents for X5-4
Page 1: ...Oracle Server X5 4 Service Manual Part No E56396 03 December 2015 ...
Page 2: ......
Page 10: ...10 Oracle Server X5 4 Service Manual December 2015 ...
Page 14: ...14 Oracle Server X5 4 Service Manual December 2015 ...
Page 21: ...Server Subsystems Overview Two CPU Block Diagram Oracle Server X5 4 Overview 21 ...
Page 36: ...36 Oracle Server X5 4 Service Manual December 2015 ...
Page 68: ...68 Oracle Server X5 4 Service Manual December 2015 ...
Page 178: ...178 Oracle Server X5 4 Service Manual December 2015 ...
Page 272: ...272 Oracle Server X5 4 Service Manual December 2015 ...
Page 340: ...340 Oracle Server X5 4 Service Manual December 2015 ...