
Figure 3-10
Pulling out an inner rail
2.
Aligning the nail heads on the server with their L-shaped cutouts on the rails, place the
server onto the rails. See step (1) in
RH2288 V3 Server
User Guide
3 Installing and Removing the Server
Issue 32 (2019-03-28)
Copyright © Huawei Technologies Co., Ltd.
73