2.
Fasten the lower end of a floating nut to the top square hole within the lower target 1U
space in a front mounting bar. See step (1) in
.
Figure 3-4
Installing a floating nut
3.
Fasten the upper end of the floating nut to the mounting bar at the front of the cabinet
using the floating nut hook. See step (2) in
The floating nut is installed, as shown in (3) in
4.
Install the other floating nut using the same method.
Step 2
Install the L-shaped guide rails.
1.
Place a guide rail horizontally in the planned position and keep the guide rail in contact
with the mounting bars in the cabinet. See
Figure 3-5
Installing an L-shaped guide rail
2.
Tighten the screws.
3.
Install the other guide rail using the same method.
Step 3
Install the RH2288 V3.
RH2288 V3 Server
User Guide
3 Installing and Removing the Server
Issue 32 (2019-03-28)
Copyright © Huawei Technologies Co., Ltd.
68