Figure 3-8
Installing the RH2288 V3
3.
When the two mounting ears of the RH2288 V3 come into contact with the mounting
bars on the cabinet, tighten the captive screws on the mounting ears to secure the
RH2288 V3. See step (2) in
Step 3
After the installation is complete, connect a network cable, a VGA cable, or USB devices as
required. Connect the power cables and power on the RH2288 V3.
----End
3.4.3 Installing the Server on Holding Rails
Holding rails apply to a cabinet with a distance of 610 mm to 914 mm (24.02 in. to 35.98 in.)
between the front and rear mounting bars.
When installing the RH2288 V3 on the holding rails, you can configure a cable management
arm (CMA) to arrange the external cables connected to the server.
Procedure
Step 1
Install the holding rails.
1.
Holding down the release latch at the front end of the holding rail, pull out the locking
plate by its hook. See steps (1) and (2) in
RH2288 V3 Server
User Guide
3 Installing and Removing the Server
Issue 32 (2019-03-28)
Copyright © Huawei Technologies Co., Ltd.
71