
l
A faulty server needs to be replaced with a new RH2288 V3.
l
A different rack server needs to be replaced with the server.
l
A server component needs to be maintained.
Before installing a server, check that the guide rails of the cabinet are level, smooth, and not
deformed. This ensures surface contact between the server and the guide rails and even weight
distribution. You are advised to use the guide rails delivered with the server to ensure even
weight distribution.
The following tools are available:
l
ESD wrist strap or ESD gloves
l
Screwdriver
l
Floating nut hook
3.4.1 Installing the Server on L-Shaped Guide Rails
L-shaped guide rails apply only to a Huawei cabinet.
Procedure
Step 1
Install the floating nuts.
1.
Determine the positions for installing the floating nuts according to the installation plan.
NOTE
The floating nuts and screws are used together to tighten the screws.
The middle of two adjacent square holes with smaller spacing is the boundary of two Us. See
. The boundary lines are used as the reference for calculating device installation space.
Figure 3-3
1U boundary lines on a mounting bar
RH2288 V3 Server
User Guide
3 Installing and Removing the Server
Issue 32 (2019-03-28)
Copyright © Huawei Technologies Co., Ltd.
67