Setup & Operation 2. Specifications
C12 Rev.3
19
Item
Specification
Model Number
C12-A1401**
Model Name
C12XL
Installed wire for customer use
15 wires (D-sub)
8 pin (RJ45) Cat 5e or equivalent
6 pin (for Force Sensor)
Installed pneumatic tube for customer use
*5
ø6 mm pneumatic tubes (2 tubes),
Allowable pressure: 0.59 MPa (6 kgf/cm
2
) (86 psi)
Environmental
requirements
*6
Ambient
Temperature
5 to 40
°
C
Ambient relative
humidity
10 to 80 % (no condensation)
Vibration
4.9 m
⋅
s
2
(0.5 G) or less
Noise level
*7
LAeq = 70 dB (A) or under
Environment
Standard / Cleanroom model & ESD
*8
,
Applicable Controller
RC700-A
Default values
(Max. setting values)
Speed
3 (100)
Accel
*9
5, 5 (120, 120)
SpeedS
50 (2000)
AccelS
*10
120 (25000)
Fine
10000, 10000, 10000, 10000, 10000, 10000
(130000, 130000, 130000, 130000, 130000, 130000)
Weight
3 (12)
Inertia
0.03 (0.2)
Safety standard
CE Marking:
EMC Directive, Machinery Directive, RoHS Directive
KC Marking, KCs Marking
ANSI/RIA R15. 06
NFPA 79
*1: Mounting types other than “Table Top mounting” is out of specification.
*2: In case of PTP control
*3: Do not apply the load exceeding the maximum payload.
*4: If the center of gravity is at the center of each arm. If the center of gravity is not at the center of each arm,
set the eccentric quantity using INERTIA command.
*5: For details of the installed pneumatic tube for customer use, refer to the
Setup & Operation 3.6 User Wires
and Pneumatic Tubes
.
*6: For details of the environmental requirements, refer to the
Setup & Operation 3.1 Environmental Conditions
.
*7: Conditions of Manipulator at measurement are as follows:
Operating conditions: Under rated load, 6 arms simultaneous motion, maximum speed,
maximum acceleration/deceleration, and duty of robot operation time 30%.
Measurement point:
1000 mm apart from the rear of Manipulator
Summary of Contents for C12 Series
Page 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual C12 series Rev 3 ...
Page 8: ...vi C12 Rev 3 ...
Page 14: ...Table of Contents xii C12 Rev 3 ...
Page 16: ......
Page 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Page 84: ......
Page 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Page 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Page 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Page 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...