Maintenance 8. Joint #4
C12 Rev.3
235
4.
Install the wave generator of the Joint #4 reduction gear unit.
5.
Set the O-ring attached to the reduction gear unit to the O-ring
groove on the Joint #4 reduction gear unit.
Then, install the J4 flange.
Hexagon socket head cap bolts: 16-M3×20
Tightening torque: 2.4
±
0.1 N·m
6.
Fix the pulley spacer to the wave generator of the Joint #4 reduction
gear unit.
Hexagon socket head cap bolts: 4-M3×8
Tightening torque: 2.0
±
0.1 N·m
7.
Fix the J4 pulley to the J4 pulley spacer.
Hexagon socket set screws: 2-M4×4
Summary of Contents for C12 Series
Page 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual C12 series Rev 3 ...
Page 8: ...vi C12 Rev 3 ...
Page 14: ...Table of Contents xii C12 Rev 3 ...
Page 16: ......
Page 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Page 84: ......
Page 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Page 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Page 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Page 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...