Maintenance 7. Joint #3
220
C12 Rev.3
9.
Install the Joint #3 pulley 2 to the Joint #3 shaft.
Hexagon socket head cap bolts (with 1 brass bushing): 2-
M5
×
12
Tightening torque: 3.9
±
0.2 N·m
Insert the pulley 2 so that one of the set screws is at the flat
face of the shaft. The brass bushing is not necessary for the
screw for the flat surface. Set the bushing to the other
screw and then fix the screw.
If the screw positions are incorrect or the bushing is not set, it may cause damage on the side of the
brake and may result in the part being unable to be removed.
10.
Install the Joint #3 timing belt.
For details, refer to
Maintenance 7.3 Joint #2 – Replacing the Timing Belt
, Installation steps (1) to (2).
NOTE
Summary of Contents for C12 Series
Page 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual C12 series Rev 3 ...
Page 8: ...vi C12 Rev 3 ...
Page 14: ...Table of Contents xii C12 Rev 3 ...
Page 16: ......
Page 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Page 84: ......
Page 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Page 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Page 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Page 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...