Maintenance 4. Cable Unit
C12 Rev.3
133
56.
Install the battery board fixing plate.
Hexagon socket head cap bolts: 2-M4x10
Tightening torque: 4.0
±
0.2 N·m
57.
Connect the battery connectors.
58.
Install the battery to the battery box.
59.
Pass the Joint #1 timing belt through the cable.
60.
Use cable brackets (C1) to fix the cables to the base cable fixing plate.
Wrap the cables with the attached silicone sheet.
Use a cable bracket to fix the wrapped silicone sheet.
Hexagon socket head cap bolts: 2-M3
×
6
Tightening torque: 2.0
±
0.1 N·m
Summary of Contents for C12 Series
Page 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual C12 series Rev 3 ...
Page 8: ...vi C12 Rev 3 ...
Page 14: ...Table of Contents xii C12 Rev 3 ...
Page 16: ......
Page 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Page 84: ......
Page 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Page 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Page 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Page 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...