Maintenance 5. Joint #1
182
C12 Rev.3
Installation: Joint #1 Timing belt (M/C Cable Downward)
1.
Pass the cables and the air tubes to the Joint #1 timing belt.
2.
Mount the Joint #1 motor unit.
For details, refer to
Maintenance: 5.1.1 Joint #1-Replacing the Motor (M/C Cable Backward)
,
Installation steps (1) to (4).
3.
Mount the ground wire plate (M/C cable downward).
Hexagon socket head cap bolts: 2-M4
×
12
Tightening torque: 4.0
±
0.2 N·m
4.
Install the brake power supply to the plate. Make sure to install
the brake power supply so that the cables will be in the direction as
shown in the photo.
Cross recessed head screws with washer: 2-M3×6
Tightening torque: 0.45
±
0.1 N·m
5.
Connect the following connectors in accordance with the indications on the connector plates.
RJ45 connector: Ether
F-sensor connector: F-sensor
Install the ground wire to each connector. To connect the ground wire, insert in while holding the connector
by hand.
6.
Connect the M/C cable connectors.
Connector: X11, X12, X14, BR010, BR011, X010, X020, X040, LED, GS01, BT1
Summary of Contents for C12 Series
Page 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual C12 series Rev 3 ...
Page 8: ...vi C12 Rev 3 ...
Page 14: ...Table of Contents xii C12 Rev 3 ...
Page 16: ......
Page 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Page 84: ......
Page 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Page 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Page 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Page 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...