72
Encore Presentation System • User’s Guide
3. Hardware Installation
Installation
For this procedure, you will need:
Use the following steps to install a single screen “stack” Encore configuration:
1.
Follow the unpacking procedures as listed in the “
Unpacking and Inspection
”
section on page 52.
2.
In Appendix A, refer to the “
Physical and Electrical Specifications
” section on
page 344 for electrical and mechanical details.
3.
In Chapter 2, refer to the “
Video Processor Rear Panel
” section on page 41 and
the “
Controller Rear Panels
” section on page 49 for all connector locations.
4.
For each Processor, follow the rack mount procedures as outlined in the “
Rack-
Mount Installation
” section on page 52.
5. Ethernet
Connections
— a totally “local” network connection is recommended,
without IP connections to the outside world. Using Ethernet cables:
a.
Connect the Processors and Controller to the Ethernet Switch.
b.
Connect router(s) to the Switch.
c.
As required, connect ScreenPRO-II, PresentationPRO-II and ImagePRO
systems to the Switch.
6. Direct Source Connections
— if you elect to use direct connections, in place of
(or in addition to) router connections:
a.
As an important prerequisite, complete your “
Connection Charts
” on
page 80 to streamline your source installation procedure.
Table 3-6.
Equipment List, Single Screen Stack Configuration
Qty.
Item
Note
2
Encore Video Processors
The ID of the bottom stack Processor must always be lower than the ID
of the top stack Processor.
1
Encore Controller
Model LC only
1
Video Projector
Customer supplied
2
DVI or Analog Monitors
Program and Preview (customer supplied)
1
Ethernet Switch
Customer supplied
3
Ethernet cables
Customer supplied. Additional cables required for routers.
2
DVI Interconnect cables
Connects bottom stack Processor to top stack Processor
TBD
Dedicated sources
Analog, Video and/or DVI as required (customer supplied)
TBD
Routers
Analog, Video and/or DVI as required (customer supplied)
TBD
Interconnect cables
Analog, Video and/or DVI as required (customer supplied)
Important
It is recommended that each stack consists of two “fully
loaded” Processors, each with three M/Es. If necessary, you
can
use a mis-matched configuration (e.g., two M/Es in the
bottom stack, three in the top), but the top stack
must always
have three M/Es installed. In this way, your stacked set will
never have anything less than four M/Es available.
Summary of Contents for Encore
Page 1: ...r d b m p Manual 26 0313000 00 Revision B...
Page 16: ...16 Encore Presentation System User s Guide Table of Contents...
Page 38: ...38 Encore Presentation System User s Guide NK f What s New in the User s Guide Rev B...
Page 211: ...Encore Presentation System User s Guide 211 5 Menu Orientation Crop Menu...
Page 340: ...340 Encore Presentation System User s Guide 7 Operations Working with the DSK...
Page 374: ...374 Encore Presentation System User s Guide aK t t a ImagePRO Aux Configuration...
Page 404: ...404 Encore Presentation System User s Guide Index...