3-90
CD809
6. Secure the exhaust pipe to the engine with two cap
screws making sure the mounting brackets engage
the frame grommets; then install the muffler and
tighten the nuts securing the exhaust pipe to 20 ft-lb.
CD803
CF138A
7. Install the cooling ducts with clamps and tighten
the clamps securely.
CD515
CD793
8. Secure the engine ground wire to the engine with a
cap screw. Tighten to 8 ft-lb.
CD810
9. Connect the gear shift position switch (A), stator
connector (B), and the CDI connector (C) to the
main wiring harness.
CD797A
10. Connect the temperature sensor wire to the main
wiring harness.
11. Secure the wires to the frame with nylon ties.
12. Connect the speed sensor connector to the hous-
ing.
13. Secure the positive cable to the starter motor.
14. Secure all wiring to the frame and upper engine
bracket with cable ties.
15. Secure the two coolant hoses to the engine.
Next
Back
Section
Table of Contents
Manual
Table of Contents